MULTI-FAMILY

SOLUTIONS BY TRADE

It's Not Just About Engineered Wood It's About Having the Right Engineered Wood "System"
EWSolutions

Innovative Ways to Make Light Framed Construction

We Found a "System" using Modern Day Products to Solve Modern Day Construction Needs

CONTRACTORS

TrimJoist, Mass Ply Panels in Corridors with Tall wall construction allows your construction team to save time on your Schedule.

"The yeild has been tremendous, huge amount of time savings"

Build Faster - Safer Work Conditions - Saving on Budget

The EWS System combines TrimJoist Open Web TrussesMass Ply Panels, and Tall Wall construction to save you time and money. By cutting down on Drilling Holes, 1 layer GWB Fire/Sound Assembly, Providing a level Floor System Throughout your Building. 

Key Advantages:

Faster Install Times

● Reduced Soffits Required

●No expensive Rim Boards

●1 layer of GWB Ceiling Required

Cost Savings Across Trades

● No Drilling

● Less Pieces to Install

● Faster Framing Install

Better Performance

● Building shrinks more Consistently

● Solid Floor Performance/ No Squeaks

● TrimJoist a Perfect Fit Every Time

Cuts Down on Accidents

● Less Time on Ladders for All MEPF Trades

● Mass Ply Panels Makes a Great Platform

● Cleaner Job Site

ARCHITECT

With 11 7/8″ TrimJoist you are able to still have a Shallow Depth Structure to get the most our of the Building Height and have room for all the MEPF to be located in the ceiling cavity.

Quality Construction - Reduce conflicts - Saving your Client Money

Streamline Design and Solve Common Architectural Challenges with a better Sound Performance While Elimination those Unsightly & Expensive Soffits.

"This is something we reccomend to all out clients, and will definitely be using going forward into the future."

Key Advantages:

Ceiling Assembly

● Layer 5/8 "GWB Fire And Sound

●Full Depth Insulation in Ceiling Cavity to Prevent need for Sprinkler Heads

● MEPF Within Truss Cavity

Large Corridor Mec'1 Chase

● Shallow Depth Mass Ply in the Corridors Stronger Than CLT

● Larger Space to run MEPF without sacrificing Ceiling Heights

Floor Performance

●Design with Stronger TrimJoist Spaced at 24" OC

● Building Shinks Consistanly Providing a Flat Level Floor

● TrimJoist Prevent Floor Squeaks

Code Compliance

● 1hr Fire Assembly UL-528

● Products are in accordance with IBC, UL, IFP & NFPA

● While cutting down on our carbon footprint

ENGINEERS

TrimJoist is Stronger than the conventional I-Joist and often can be spaced at 24″ oc Providing a High-Quality Floor System that saves Job Cost and Time Off Schedule. Compared to a TJI 560 in strength.

Simplify Details - Reduce Conflicts - Better Floor Performance

Tall Wall Construction Eliminates time consuming Rim Board Design along with Exact Fit Open Web TrimJoist Eliminating field modifications

"The system is great and has providied flexibility and speed to the project."

FRAMERS

This Framing Package is not just about framing. It benefits all Trades involved by installing less pieces, Less Ladder Time, No Drilling, No Soffits, 1 Layer GWB, that adds up to substantial Saving on your budget and overall Schedule. 

Provide your Contractor Solutions for their Project

For those Turn Key Projects you can now sell your Company as the one that provides Substantial Savings on your customers over all schedule while providing a Strong  Quality Building with Safer Working Conditions.

"We used to produce 10k sq ft in a week, now we can produce upwards of 20k sq ft in a given week."

Make sure you are taking care of your Customer

It has been proven numerous times the Framer using the same man power has installed 20,0000 to 25,000 of finished structure in a week by using the TrimJoist Trimmable Open Web Trusses, Mass Ply Panels in Corridors, Tall Wall Construction, a long with Panlized Walls.

Key Advantages:

Faster Install Times

● TrimJoist 24" OC with 3 1/2" Wide Chords.

●Field Cut an Open Web TrimJoist to Exact Fit Every Time

● No Expensive Rim Boards & Cuts Down On Straps To Install. Frees Up Manpower.

●Installing Tie Downs Easier — No Drilling Through Rim Boards.

●No Waiting On Field Repairs Like With Plated Trusses.

● No Fixing Holes In I-joists.

● Safer Working Conditions.

Tall Wall Benefits

● Minimum Cost For Added Stud Length.

● 1 Laborer Can Install Hangers Ahead Of Framing Crew.

● Less Straps To Supply And Install.

● Building Shrinks More Evenly — No Humps.

● Ease Of Install Of Trimjoist.

● Ducts, Wires, And Pipes Can Pass Through Without Cutting.

● Insulation In Walls Provides A Fire Block. ​

Mass Ply Panels in Corridors

●Alot Less Labor To Install — Redirected Free Labor.

● Install 48' Of Corridor In Less Than 5 Minutes.

● Install Mpp As Trimjoists Are Erected, Providing A Wide Working Platform.

● Provides A Large Platform To Store Materials.

● Manufactured To Fit Without Cutting.

● Provides Safer Working Conditions. ​

Benefits All Trades

● Building Shrinks More Consistently — No Humps, Perfectly Flat Floor.

● Shallow Depth In Corridor Allows More MEPF.

● 1-layer Fire/sound System Saves Your Customer On Budget.

● No Holes To Drill For Mepf — Faster Install Of Their Products.

● Gwb Installers Can Load More On Carts Without Damaging Mass Ply Panels In Corridors.

● Less Cleanup For All Trades.

Mechanical, Electrical, Plumbing Fire

EWSolutions provides a “System” that really benefits MEPF trades, allowing them to work safer and faster, helping reduce the schedule while cutting down on the budget.

Run Lines Faster - Safer - More Efficiently

The EWS System allows for No drilling. No ladders. No wasted time.

"Their products have made our job so much easier." "We can't reccomend it more!"

Key Advantages:

Open Web Design:

● Easily Run Ducts, Pipes, And Lines Through The Trimjoist Open Web Truss.

●Longer Duct Runs — Cutting Down 70% Less Joints.

● Saving Tremendous Amount Of Time Off Construction Schedule.

Less Ladder Time:

● Feed Lines While Standing On The Floor — Safer And Faster.

● Less Tools In Hand While Installing Materials.

● Big Hole Saws Are Not Required.

Fewer Cuts, Fewer Errors:

●No Guessing Where On Size And Location Of Holes To Drill.

● Less Sawdust In Eyes And Cleanup.

● No Drilling Through Thick Rim Boards.​

Better Coordination:

● With Open Webs To Run Lines Through, Your Installers Will Be More Efficient.

● wsolutions Can Assist In Early Design Stages To Help In Making The Project A Success.

● Using Mass Ply Panels In Corridors Allows A Wide Open Cavity For Mepf Runs.

GWB & INSOLATION

One Layer - Better Performance - Faster Results.

Key Advantages:

One-Layer Fire Assembly:

● UL-521 Has 1-layer Sheet Rock On The Ceiling Fire/sound Assembly.

●Large Savings Of Material And Labor.

Improved Sound Performance:

● NFPA-13 Requires Open Cavities Within The Ceiling Assembly To Require Full Depth Insulation.

● This “system” Has Better Sound Rating Than An I-joist.

Fewer Soffits:

● MEPF Can Now Be Run Through Open Web Trusses — This Eliminates The Need For Soffits.

● Kitchen Vents Can Be Run Through A Soffit Or In The Truss Cavity With Gwb Chase.

Reduced Labor:

● 24" Oc With 3 1/2" Wide Bottom Chords = Less Taping & Mudding.

● With A Strong Mass Ply Corridor Floor, You Can Stack More Material On Carts Without Damaging The Floor.

REACH OUT TO LEARN MORE!